Megger DLRO2 Ducter 2A Handheld Low Resistance Ohmmeter, CAT III 600V / CAT IV 300V, Difference Meter, Long Lead Test Mode, IP54 (1012-280)
Key Features
?
Question about this product?
Features
- Handheld 2A Ducter low resistance ohmmeter delivers fast, accurate, repeatable measurements in electrically noisy locations
- Difference Meter allows repetitive measurements to be easily compared against an initial reference, translating percentage change to a clear needle/pointer display
- Five selectable test current ranges (2A, 1A, 100mA, 10mA, 1mA) suit a wide variety of low-resistance applications
- Dedicated long-lead test mode optimises output at up to 1A into 4 ohms for wind turbine and avionic lightning protection testing
- Active live voltage protection up to 600V between any terminals without blowing a fuse
- Safely tests inductive loads at 1A
- CAT III 600V / CAT IV 300V safety rating to IEC 61010
- IP54 rated for protection against dust and moisture in outdoor use
- As many as 500 x 2A, 3-second tests from a full charge
- Supplied with compact CAT III 600V / CAT IV 300V rated Kelvin clip test leads
- Noise warning indicator alerts the user when measurements may be affected by electrical noise
Technical Information
- Test Current Ranges 2A, 1A, 100mA, 10mA, 1mA
- Max. Compliance Voltage 3.24V (1A mode), 2.2V (2A mode)
- Current Output Accuracy ±10%
- Safety Rating CAT III 600V / CAT IV 300V to IEC 61010
- Live Voltage Protection Active protection to 600V
- Display Full colour LCD with configurable backlight
- Battery Life Approx. 500 x 2A, 3-second tests
- Ingress Protection IP54
- Dimensions 228 x 105 x 75 mm
- Weight 905 g
Items Included
- DLRO2 Low Resistance Ohmmeter
- Kelvin Clip Test Leads (CAT III 600V / CAT IV 300V)
- Rechargeable Battery (internal)
- Carrying Case







